DC Fast Charging

50–150 kW DC Fast Chargers for High-Performance Sites

Keep customers and fleets moving with reliable, fast DC charging. Ideal for service centres, precincts, councils and high-traffic destinations.

20–80% in ~20–40 mins* model & battery size dependent
Request a Site Assessment
Rise Energy 50–150kW DC fast charger at a commercial site

Why Choose 50–150 kW DC Fast Charging?

DC fast chargers bypass the vehicle’s onboard AC charger and deliver power straight to the battery, drastically reducing charge times compared to AC wall chargers.

For busy commercial locations, DC fast charging is a powerful way to:

  • Serve more EV drivers in less time.
  • Increase site attractiveness and dwell time.
  • Enable new revenue streams through paid charging.
  • Support fleet and operational vehicles on tight schedules.

Where These Chargers Shine

Service stations
Highways & corridors
Retail & destinations
Business hubs
Fleet depots
Council car parks

Power Bands for Different Sites

50 kW DC

Ideal for smaller sites, regional towns and longer-stop destinations.

  • Good for 45–90 minute stays.
  • Lower grid impact and capex.
  • Great first step into DC charging.
75 kW DC

Balanced speed and cost for busy commercial and council locations.

  • Popular choice for urban sites.
  • Supports multiple daily sessions per plug.
  • Works well with load management and solar.
120–150 kW DC

High-throughput sites where speed and turnover matter most.

  • Great for highway service centres.
  • Supports larger-battery EVs efficiently.
  • Designed for future growth and higher utilisation.

Smart, Connected and Revenue-Ready

All Rise Energy DC fast chargers are powered by our smart software platform, giving you control over pricing, access and performance.

  • Tap-and-go payments and billing options.
  • Real-time monitoring of uptime, usage and revenue.
  • Remote diagnostics and firmware updates.
  • Dynamic load management to protect your site supply.

Integration & Incentives

  • Support for solar and battery integration.
  • OCPP-ready for network and third-party platforms.
  • Support for council and government grant applications.

Rise Energy can help you navigate available grants and funding to support your DC rollout.

DC Fast Charging FAQs

How long does it take to charge on a 50–150 kW DC charger?

As a general guide, many EVs can go from around 20% to 80% in roughly 20–40 minutes, depending on battery size, vehicle charge curve and charger power. We can model estimated charge times for your typical vehicles.

What kind of power supply do I need?

DC fast chargers require three-phase supply and sufficient capacity from the local network. Rise Energy will assess your site, liaise with the DNSP where required, and design an appropriate electrical solution.

Can I charge drivers for using the stations?

Yes. Our platform supports paid public charging, custom tariffs, idle fees and discount codes. You decide the pricing model; we provide the tools to implement and manage it.

Are these chargers suitable for fleets?

Absolutely. 50–150 kW solutions are ideal for light commercial fleets, council vehicles and logistics operations where downtime must be minimised and scheduling is critical.

Ready to explore DC fast charging for your site?

Rise Energy can help you size the right charger, secure funding support and deliver a turnkey installation.