Free shipping on orders over $75 · Shop the coastal collection

GSR800 - 802 Tailte - CIE (FS) Freight Type_Tippler around five weeks after working

SKU: 42279933612

4.3
USD292.50 USD335.50

Pay in 4 interest-free payments of $73.12 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 12 - Aug 17

Description

around five weeks after working its last train

In the late 1970s some remaining Siphon Gs were transferred into Departmental traffic

60074 was outshopped from Brush Works in Loughborough on 29th October 1991

The widespread withdrawal of 21t hoppers from the mainline network led to many being repurposed by BR or sold on to private companies for internal use

Fully sprung metal buffers and factory-installed pipework

GSR800 - 802 Tailte - CIE (FS) Freight Type_Tippler around five weeks after workingThe three 4 6 0 Class 800 locomotives; 800 Mae, 801 Maa and 802 Tilte, were designed by the Great Southern Railways Chief Mechanical Engineer Edgar Bredin and his chief draughtsman, H. C Beaumont and represented a quantum leap forward in Irish locomotive design, being the first three cylinder express locomotives built in the country. By the mid 1930s, the top link Dublin Cork services had reached a critical loading point, where the existing fleet of 4

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products